Further development of the Challenger 1 by Vickers Defence Systems resulted in the Challenger 2 MBT, of which 386 have been ordered by the British Army, with deliveries running from 1994 through to 2,000. Oman has ordered 18 Challenger 2 MBTs. With the introduction of Challenger 2, all remaining Chieftain and Challenger 1 MBTs will be phased out of service with the British Army. Although similar in appearance to Challenger 1, the Challenger 2 MBT has many improvements including a brand new turret armed with the latest 120mm L30 rifled tank gun firing a new APFSDS-T (Armour Piercing Fin Discarding Sabot Tracer) projectile with a depleted uranium penetrator. The new computerized fire control system, all electric gun control and stabilizing system, and stabilized sights for the commander and gunner give a high degree of first round hit probability under both day and night conditions. Standard equipment includes a thermal camera over the manlet of the 120mm gun which provides a picture for gunner and commander, as well as an NBC (Nuclear, Biological, Chemical) system, mounting points for additional fuel drums at the rear, and mounting points for a Combat Dozer Blade at the front of the hull. Item No 00308 Item Name British ChallengerⅡ Bar Code n/a Scale 1:35 Item Type Static Armor Model Brief n/a Total Parts n/a Metal Parts n/a Photo Etched Parts n/a Film Parts n/a Total Sprues n/a Paint Schemes n/a Released Date n/a More Features n/a